Our Projects

Delivering compliant fire protection solutions across commercial, hospitality, and industrial projects throughout New Zealand.​

Featured Work

Recent Installations

Residential · Multi-Storey

Three Kings Apartments

Active Fire Safety completed full fire protection works on this modern multi-storey residential apartment development in Three Kings, Auckland. The project involved installing compliant fire systems across all levels of the 7-storey brick building, coordinated closely with the main contractor throughout the construction programme.

  • Sprinkler system design & installation (all floors)
  • Hydrant & pipework infrastructure
  • Fire alarm & detection systems
  • Emergency lighting installation
  • Compliance documentation & signoff
Active Fire Safety
Active Fire Safety
Active Fire Safety
Active Fire Safety

Restaurant · Hospitality

108 Taste Restaurant Albany

Full fire protection package for this restaurant in Albany. Works were delivered within a live fit-out environment alongside other trades, ensuring full compliance without disrupting the broader construction programme.

  • Sprinkler system design & installation
  • Fire alarm system integration
  • Emergency lighting installation
  • Compliance documentation & signoff
WhatsApp Image 2025-12-15 at 17.17.16

Warehouse · New Build

Whitianga Warehouse Development

Active Fire Safety is engaged on a large-scale new build in Whitianga, Coromandel. The project involves a major steel-frame commercial building currently in structural construction phase. Our team is working closely with the main contractor to plan and deliver fire protection systems from the ground up.

  • Early-stage fire system design & planning
  • Sprinkler network installation (staged)
  • Hydrant system infrastructure
  • Fire alarm & detection systems
  • Coordination with structural trades on-site

Transit · Infrastructure

Britomart Station, Auckland

Active Fire Safety completed a full fire protection installation at Britomart Transport Centre in Auckland’s CBD. Works were carried out within a live operational transit environment, requiring careful coordination with site management to ensure zero disruption to public access and rail operations.

  • Sprinkler system installation & pipework
  • Pressurised hydrant system
  • Pneumatic valve & gauge assembly
  • Electrical switchboard integration (ABB SACE S3 breakers)
  • Variable speed drive installation (Danfoss VLT Aqua Drive)
  • Fire suppression cylinder installation (PAFSS)
  • Compliance documentation & signoff
  •  